Reporting progress (object-oriented API) — Progress
Description
Reporting progress (object-oriented API)
Reporting progress (object-oriented API)
Details
Reports progress to the user during long-running operations.
This package exposes two distinct programming APIs for working with
progress. withProgress()
and setProgress()
together provide a simple function-based interface, while the
Progress
reference class provides an object-oriented API.
Instantiating a Progress
object causes a progress panel to be
created, and it will be displayed the first time the set
method is called. Calling close
will cause the progress panel
to be removed.
As of version 0.14, the progress indicators use Shiny's new notification API.
If you want to use the old styling (for example, you may have used customized
CSS), you can use style="old"
each time you call
Progress$new()
. If you don't want to set the style each time
Progress$new
is called, you can instead call
shinyOptions(progress.style="old")
just once, inside the server
function.
See also
Methods
Public methods
Method new()
Creates a new progress panel (but does not display it).
Usage
Progress$new( session = getDefaultReactiveDomain(), min = 0, max = 1, style = getShinyOption("progress.style", default = "notification") )
Arguments
session
The Shiny session object, as provided by
shinyServer
to the server function.min
The value that represents the starting point of the progress bar. Must be less than
max
.max
The value that represents the end of the progress bar. Must be greater than
min
.style
Progress display style. If
"notification"
(the default), the progress indicator will show using Shiny's notification API. If"old"
, use the same HTML and CSS used in Shiny 0.13.2 and below (this is for backward-compatibility).
Method set()
Updates the progress panel. When called the first time, the progress panel is displayed.
Usage
Progress$set(value = NULL, message = NULL, detail = NULL)
Arguments
value
Single-element numeric vector; the value at which to set the progress bar, relative to
min
andmax
.NULL
hides the progress bar, if it is currently visible.message
A single-element character vector; the message to be displayed to the user, or
NULL
to hide the current message (if any).detail
A single-element character vector; the detail message to be displayed to the user, or
NULL
to hide the current detail message (if any). The detail message will be shown with a de-emphasized appearance relative tomessage
.
Method inc()
Like set
, this updates the progress panel. The difference
is that inc
increases the progress bar by amount
, instead of
setting it to a specific value.
Usage
Progress$inc(amount = 0.1, message = NULL, detail = NULL)
Arguments
amount
For the
inc()
method, a numeric value to increment the progress bar.message
A single-element character vector; the message to be displayed to the user, or
NULL
to hide the current message (if any).detail
A single-element character vector; the detail message to be displayed to the user, or
NULL
to hide the current detail message (if any). The detail message will be shown with a de-emphasized appearance relative tomessage
.
Method getMin()
Returns the minimum value.
Usage
Progress$getMin()
Method getMax()
Returns the maximum value.
Usage
Progress$getMax()
Method getValue()
Returns the current value.
Usage
Progress$getValue()
Method close()
Removes the progress panel. Future calls to set
and
close
will be ignored.
Usage
Progress$close()
Method clone()
The objects of this class are cloneable with this method.
Usage
Progress$clone(deep = FALSE)
Arguments
deep
Whether to make a deep clone.
Examples
## Only run examples in interactive R sessions if (interactive()) { ui <- fluidPage( plotOutput("plot") ) server <- function(input, output, session) { output$plot <- renderPlot({ progress <- Progress$new(session, min=1, max=15) on.exit(progress$close()) progress$set(message = 'Calculation in progress', detail = 'This may take a while...') for (i in 1:15) { progress$set(value = i) Sys.sleep(0.5) } plot(cars) }) } shinyApp(ui, server) }